Sweater progress

I did get my CF Charlie’s Cardigan onto the blocking mats yesterday.

20160117_2The sleeves are drying on a towel on the table. Turned the fans on fronts and back last night so I’m hoping they are dry and I can seam the shoulders and start on the buttonband today.

I also fund my CF Stonington I was working on about this time last year.  Fronts and backs done, first sleeve (after some moving knitting last night) is about ready to start the underarm castoff.20160117_3 The sleeves are a little slower knitting  because the entire length of them is 2 x 2 rib  – I was a bit concerned at first that it looked so skinny compared to my other sweater sleeves but the rib is really stretchy.

I may need to pile all those sweater pieces and a pile of quilts on top of me – I’m not even venturing to the end of the apartment complex to get my mail due to this

7Yeah- does it really matter whether the sun is shining when it’s minus seven outside — I don’t think so.    Glad I don’t have to venture out anywhere today.

 

Advertisements